Answers to the questions we hear most about switchboard upgrades, safety, compliance, power capacity and Energex in Brisbane and South East Queensland. Each answer links to a detailed guide or service page.
Call 1300 788 455 or get a fixed quote.
Common signs are ceramic fuses, no or too few safety switches, frequent tripping, heat or burning smells, and no room for new circuits. See home switchboard upgrades and fuse box vs circuit breakers.
An upgrade improves an existing board, for example by adding safety switches or circuits. A replacement installs a new board, often with new mains. See upgrade vs replacement and switchboard replacement.
Our projects typically range from around $6,000–$7,000 for smaller board upgrades up to around $400,000 for large commercial and industrial main switchboards. Every job gets a fixed quote. See the cost guide and commercial cost guide.
Yes. We design the board, have it built by a switchboard builder and install it. See custom switchboard installation and installer vs manufacturer.
An existing board must be safe, and new work must meet current rules. Rentals must have a safety switch, and pre-1992 homes need one within three months of sale. See switchboard compliance in QLD.
Yes. Queensland rental properties must have a safety switch. See safety switch rules for landlords and safety switch installation.
Switchboards built or imported before 2004 may contain asbestos, especially those installed before 1990. See asbestos in old switchboards.
Yes. Only licensed electrical contractors can do switchboard work in Queensland. See do you need a special licence?
Heat, burn marks, buzzing, loose connections and tripping are warning signs. See identifying unsafe switchboards, arc flash safety and thermal imaging.
Most homes don’t. Three phase helps with large loads, fast EV chargers and commercial equipment. See single vs three phase and three phase power.
Energy data logging measures real peak demand. See what is energy data logging, data logging service and power capacity upgrades.
Supply upgrades, new mains and meter changes need an Energex application or EWR. See Energex applications explained and meter box replacement.
Inspect, get comparable quotes, approve the spend, notify residents and plan the outage. See the Body Corporate Switchboard Upgrade Guide and body corporate switchboards.
With good pre-work, many changeovers take a few hours, often done after hours. See shutdown planning and commercial switchboards.
It depends on spare capacity and load management. See EV chargers for strata, EV charging for body corporates and EV charger installations.
Yes, including main switchboards, capacity upgrades and maintenance. See factory and warehouse switchboards and maintenance and repairs.
Brisbane and South East Queensland, including Ipswich, Logan, the Gold Coast and the Sunshine Coast. See service areas.
Tell us about your switchboard or project and we’ll get back to you with advice and a fixed quote. Prefer to talk? Call 1300 788 455.