Replacing the main switchboard in a unit block or townhouse complex is one of the bigger electrical decisions a body corporate committee makes. It affects every lot, usually needs a planned power outage, and involves Energex, metering providers and residents as well as the electrician. This step-by-step guide walks committees and strata managers in Brisbane and South East Queensland through the process – from the first signs of trouble to the day the power comes back on.
Quick summary: inspect and report → get at least two comparable quotes → approve the spend at the right level → notify residents and book Energex and metering → planned changeover → certificate and handover.
Common triggers we see in Brisbane complexes:
If several of these apply, the board is usually at the end of its life. See body corporate switchboard upgrades for the types of buildings we work on.
Before asking for quotes, have a licensed electrical contractor inspect the main switchboard, meter panels, consumer mains and the building’s actual load (data logging is useful when tripping is the problem). The report gives the committee something objective to table, and lets every quoting contractor price the same scope.
Ask each contractor to quote the same scope and to state separately:
In Queensland, if the cost is above the committee’s major spending limit, the committee generally needs at least two quotes and the expense usually has to be approved by the body corporate at a general meeting (urgent safety work and items already in an approved budget are treated differently). Your body corporate manager can confirm which rules apply to your scheme. For typical price ranges, see our switchboard upgrade cost guide.
Once a quote is chosen, the committee or general meeting resolves to proceed and confirms whether the work is funded from the sinking fund or a special levy. Ask the contractor for a payment schedule that matches the board manufacture and installation stages.
A main switchboard changeover needs Energex to disconnect and reconnect supply, and each lot’s metering provider to remove and reinstall meters. Some sites also move to bulk or embedded metering at this point (see our meter box and main switchboard replacement page). These bookings set the changeover date, so the electrician should lodge them as soon as the job is approved.
We provide notice templates and can schedule work after hours or across stages to minimise disruption.
On the day, the old board is isolated, the new board installed and terminated, meters reinstalled and every circuit tested before supply is restored. The committee receives a Certificate of Testing and Safety, updated circuit labelling and as-built documentation for the building records.
The main switchboard and consumer mains are common property, so the cost is usually met by the body corporate (sinking fund or special levy). Switchboards inside individual lots are generally the owner’s responsibility.
It depends on the size of the building and the scope. We confirm the expected outage in the quote and can stage works or provide temporary power for essential services.
Yes. We regularly work with strata managers, building managers and committee members, and provide the documentation needed for meetings.
Tell us about your building and we’ll organise an inspection and a written quote your committee can table. Prefer to talk? Call 1300 788 455.