New Farm Mains Power Upgrade, Switchboard Relocation & Upgrade – Body Corporate

Suburb: New Farm
Size: 14 Units
Building: Highrise Complex
Project Cost: $93,500

The whole shebang! Due to modern power demands, the overall power usage at this complex was exceeding it’s maximum power supply causing nuisance tripping. Therefore a consumer mains upgrade was in order. The switchboard was also upgraded and relocated to a suitable location to meet compliance with AS3000:2018. For the consumer mains upgrade, the driveway was cut up for the new cabling to installed. A services locator was also used to ensure no services were damaged during installation. All civil works were co-ordinated by our team, in line with our mission that we take care of it, so you don’t have to!

 

Mains Power Upgrade: New Farm