Southport Switchboard Replacement – Body Corporate Highrise
The main switchboard at this 30-storey holiday complex in Southport on the Gold Coast was unsafe and becoming unserviceable because of its original design and obsolete parts.
The body corporate engaged Switchboard Solutions to replace the switchboard. Because the building operates as a holiday complex, the time frames we had to work within were tight. Through careful logistics planning we removed and replaced the switchboard and re-connected power to all 60 units and essential services (including the lifts) within 12 hours, with power back on to all communal areas within 18 hours.
This was a highly challenging project that was completed seamlessly thanks to detailed planning and an experienced team of switchboard electricians. See more about our switchboard upgrades and replacements on the Gold Coast and our body corporate switchboard work.