Case Study
Tingalpa Switchboard Upgrade & Bulk Metering
We were called out for a loss of supply to the commercial complex. Upon arrival we found the switchboard to be in very poor condition and unsafe to repair and re-connect. Utilizing our contacts, we were able to source a switchboard, which was installed 7 days after the initial power loss. This would have normally been a 12 week turnaround, and saved the owner from having to pay for a generator hire and fuel for that period of time.