Replacing or upgrading a main switchboard almost always means a planned power outage. Done well, residents and tenants barely notice. Done badly, it means lost trade, angry residents and spoiled stock. Here is how to plan a shutdown that keeps downtime to a minimum.
Call 1300 788 455 or get a fixed quote.
Good planning moves work out of the shutdown window. That includes pre-wiring the new board, running new cables, labelling every circuit and preparing a step-by-step changeover plan. The power should only be off for the final connection and testing.
Lifts, fire systems, refrigeration, servers and medical equipment may need generators or temporary supplies. Identify these loads early and agree how each will be handled.
We plan and run shutdowns for body corporates, commercial buildings and factories and warehouses across Brisbane and SEQ. See also the Body Corporate Switchboard Upgrade Guide.
It depends on the job. With good pre-work, many changeovers take a few hours. Large main switchboards can take longer, which is why they are often done overnight or on weekends.
Yes. We regularly schedule shutdowns overnight, on weekends or during business closures.
At least a week is good practice, with a reminder a day or two before.
They are identified in planning. Some need temporary power, and all are checked as soon as power is restored.
Tell us about your building and we’ll plan the outage, paperwork and changeover with a fixed quote. Prefer to talk? Call 1300 788 455.