Coorparoo Switchboard Upgrade – Commercial

Suburb: Coorparoo
Size: 8 Tenancy Complex
Building: Commercial Complex
Project Cost: $39,000

A new tenant required a large power increase to the tenancy they were occupying, however the main switchboard was non-compliant to allow for the power increase. The switchboard was upgraded to meet all the required regulations and the power was connected to the tenancy. Two large generators were hired for the changeover to power three fridge/freezers for the duration of the changeover so that another tenant did not lose all their food stock. This job was completed on a Monday night to minimize power disruption to the retail tenants.