Don’t let your business be held back by an old and outdated switchboard: we make sure you stay compliant with the ever-changing regulations to prevent electrical board faults or infrastructure failure. Older switchboards tend to get overloaded (especially with newer appliances), so it’s important to get a power upgrade to prevent power loss that could last for days or even weeks.
Upgrading your electrical switchboard can have numerous benefits, which include minimising safety concerns, preventing potential fire dangers, and reducing maintenance costs. We offer a number of solutions depending on the state of your electrical switchboard – from warehouses to apartment buildings, we cover it all.
In short: whatever your plans are, our switchboard electricians will provide expert advice on what the best solution is for your premises.
Call Us - 1300 788 455We’re happy to provide a free quote for our electrical switchboard solutions for our Brisbane, Sunshine Coast, and Gold Coast customers. Give us the details of your premise and we’ll provide you with an outline and phase power upgrade solution that’s tailored to your system.
For smaller switchboards that we can source immediately, the turnaround time is usually 2-4 weeks. For larger, customised switchboards, the process usually takes 3-5 months, since the switchboard needs to be built first before the installation.
Yes, we need access to anywhere there is an electrical point in the building so we can complete mandatory testing. If we can’t get access to an area, it will remain de-energised until we can complete testing there.
That largely depends on the size and complexity of the switchboard upgrade. However, we will fully inform you of the duration of the proposed power outage at the quoting stage.
By law, the installation must be brought up to the current Queensland Electricity Metering & Connection standards when you upgrade your system.
We account for most of the fees within our price. At times, we give an estimate for certain aspects of a job if a firm price cannot be finalised during the quoting stage. These can be fees from an electricity retailer, services locator, building works (if required), fault finding, etc. Our extensive experience means you will get as close to a fixed price as possible for the job.
Usually a building manager, committee member, property manager or body corporate manager. We work closely with the relevant contacts to ensure ease of access on the day/s of the installation.
Yes, we work with you to schedule a suitable time for the upgrade.